B | 6.9.17 | Friday

 Announcements:

  • Reminder: Grades close Monday: any missing work will be recorded as such (NTI)
    • remember it’s always better to turn in something late than not at all
    • Check to make sure you are not missing any projects. If you are, you will need to prioritize you time over the next week
  • Final day of presentation week:
    • Today:
      • 10:15 Arvid
    • when the person before you leaves the production room you may get ready in the hallway
    • Make sure your boards are in the production room before you leave for the day
    • Quiet, self-paced work period. Disruptions will not be tolerated
    • No printing during presentations
    • Check out library books if you are using it in your presentation
  • 9:35-10:05 am CTE Conference room: PE summer class. Arvid, Charlotte, Joey, Aislynn
  • final exam wrap -up in DCM 1 lab @ 11:15
    • bring a printed copy of your English essay to the round table
  • Library books: Please confirm with an instructor that you have returned your book (Joey)
  • Make-up time today:
    • Spencer -15 minutes
    • Dresden- 10 minutes

Assignments for the week:

  1. Snowboard assignment
    • If you missed yesterday’s presentation, it is here: https://vimeo.com/220629194
    • template is on the server (workgroup/snowboard template)
    • first comp due EOD Tuesday June 13th
  2. DCM yearbook
    • Danny, Spencer, turn in pages today!
  3. Z11_Personal_Timeline
  4. Face-to-Face 

Housekeeping:

  1. Make PDF’s of project work (in case you don’t have the software home)
  2. Save whatever work you want to take home on a flash drive (remember that your Lightroom catalog and raw photographs are saved locally) see Ms. V if you need a flash drive
  3. Clean workstation & monitor
  4. Remove your work from the walls
  5. Recycle files you do not need. Printed projects and prototypes in good condition may be donated to the classroom as samples, as can manila folders with minimal writing
  6. DO NOT delete project/assignment work off of the server
  7. DO delete all personal files off of desktop/server
  8. Check in books, color wheels and tools with an instructor

Upcoming dates:

  • 6.14.17 • Burton field trip
  • 6.15.17 EOY celebration (morning) + Recognition Practice in the morning (afternoon)
  • 6.15.17 Recognition Ceremony (in the evening)

DCM1 Client work/DCM 2 updates:

  • Savannah:
    • Food label: Waiting for printing sign-off, and numbers, from client.

B | 6.9.17 | Friday (2nd year)

Announcements

  • Final day for presentations: No printing during presentation period. Remember this is an exam period. Quiet work is expected from all students.
  • Equipment return: Brian-tablet, flash
  • Apollo- turn in laptop, power cord and all resources before you leave today
  • Tyer- to work in DCM 1 lab

EOY Housekeeping/Procedures

  1. Laptops will be collected EOD Monday June 12th. Please see Ms. Vaida if you need a flash drive.
  2. Workstations must be left in the condition that they were when you came. Please organize, recycle, take home work.
  3. Server: Update your personal server folder with all project work from this year (make sure it is in GD2 folder). Delete any personal work or Design Studio work that is in your personal folder on the server. DO NOT touch the jobshop folder files (unless it is the clean up a job you have not yet been assessed on)
  4. Make PDFs of any/all work you would like to take with you (can be either project work or Design Studio work)
  5. Save whatever work you want to take home on a flash drive (remember that your Lightroom catalog and raw photographs are saved locally) see Ms. V if you need a flash drive
  6. Clean workstation & monitor
  7. Remove your work from the walls
  8. Recycle paper that you do not need. Printed projects and prototypes in good condition may be donated to the classroom as samples, as can manila folders with minimal writing
  9. DO NOT delete project/assignment work off of the server
  10. Do delete all personal files
  11. Check in books, color wheels, tools etc. with an instructor

Projects/Assignments/Client Work

Upcoming dates

  • 6.14.17 Burton field trip
  • 6.15.17 EOY celebration in the morning  + Recognition Practice after lunch
  • 6.15.17 Recognition Ceremony (evening)